Shrink Wrap U.K. Encapsulate Kingsnorth Power station using VERISAFE

Complete plastic Solutions have recently supported Shrink Wrap U.K. in providing materials assisting with Shrink Wrap encapsulation during the demolition process.

Shrink Wrap encapsulation was the only method that could provide a solution allowing for environmental containment during the demolition process.

VERISAFE materials are the strongest and most reliable materials in the industry providing unique bidirectional shrinking capability.

Shrink Wrap U.K. installed and completed 2500m2 onetime and in budget as required.

A member installer Shrink Wrap U.K. can be contacted at shrinkwrapuk@gmail.com